theGeotechnica – Issue No.9: March 2012

March 2012

– Wimbleball Dam – Digital Packer Testing – A case studyconducted by Geotechnics looking at digital packer testing.

– Moisture Content – what difference does it make? – An examination of moisture content, and how it can affect you.

– Part 2: What are the NEC3 contracts? – The second in a series of articles explaining the NEC form of contract.

– Drilling Fluid Flow Rates – Improving Productivity – The fourth in a series on the use of drilling fluids.

– A Tribute to Paul Blackledge – theGeotechnica pays tribute to an immensely popular member of the drilling community.

– Soil Engineering implements digital borehole logging – Digby Harman reports on Soil Engineering’s implementation of KeyLogbook across all sites.

 

To view this issue, click here….

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll Up